Herewith below we have shared more than MCQs in Estimating and costing of our Civil Engineering subject. This will be very useful to study MCQs in systematic Manner.
Quiz-summary
0 of 78 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
Information
Welcome to Practise Section…
Have a Nice day!
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Estimating and costing Practise MCQs 0%
-
thanks for being a part
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- Answered
- Review
-
Question 1 of 78
1. Question
The rate of payment is made for 100 cu m (per % cu m) in case of
-
Question 2 of 78
2. Question
The rate of an item of work depends on
-
Question 3 of 78
3. Question
The main factor to be considered while preparing a detailed estimate, is
-
Question 4 of 78
4. Question
Pick up the correct statement from the following:
-
Question 5 of 78
5. Question
Brick walls are measured in sq. m if the thickness of the wall is
-
Question 6 of 78
6. Question
The plinth area of a building not includes
-
Question 7 of 78
7. Question
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
-
Question 8 of 78
8. Question
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
-
Question 9 of 78
9. Question
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
-
Question 10 of 78
10. Question
While estimating the qualities for the construction of a building, the correct metric unit is
-
Question 11 of 78
11. Question
Pick up the correct statement from the following:
-
Question 12 of 78
12. Question
The brick work is not measured in cu m in case of
-
Question 13 of 78
13. Question
Pick up the incorrect statement from the following:
-
Question 14 of 78
14. Question
The assumption on which the trapezoidal formula for volumes is based, is
-
Question 15 of 78
15. Question
In the mid-section formula
-
Question 16 of 78
16. Question
Pick up the correct statement from the following:
-
Question 17 of 78
17. Question
The cross-sections for a highway is taken at
-
Question 18 of 78
18. Question
Pick up the correct statement regarding the centre line method of estimating a building
-
Question 19 of 78
19. Question
The following item of earth work is not measured separately.
-
Question 20 of 78
20. Question
The measurement is made in square metre in case of
-
Question 21 of 78
21. Question
Cost of fittings and their fixing is specified for the following sanitary fittings
-
Question 22 of 78
22. Question
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
-
Question 23 of 78
23. Question
For the construction of buildings, the subheads of the estimate are
-
Question 24 of 78
24. Question
Pick up the correct statement from the following:
-
Question 25 of 78
25. Question
Pick up the incorrect statement from the following:
-
Question 26 of 78
26. Question
Pick up the excavation where measurements are made in square metres for payment.
-
Question 27 of 78
27. Question
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
-
Question 28 of 78
28. Question
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
-
Question 29 of 78
29. Question
The area is measured correct to the nearest
-
Question 30 of 78
30. Question
The trap which is provided to disconnect the house drain from the street sewer is called
-
Question 31 of 78
31. Question
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
-
Question 32 of 78
32. Question
The expected out turn of 2.5 cm cement concrete floor per mansion per day
-
Question 33 of 78
33. Question
Pick up the correct statement from the following:
-
Question 34 of 78
34. Question
While preparing a detailed estimate
-
Question 35 of 78
35. Question
The item of the brick structure measured in sq.m, is
-
Question 36 of 78
36. Question
The most reliable estimate is
-
Question 37 of 78
37. Question
According to ISI method of measurement, the order of the sequence is
-
Question 38 of 78
38. Question
Anti-siphonage pipe is connected to
-
Question 39 of 78
39. Question
Pick up the correct statement from the following:
-
Question 40 of 78
40. Question
Pick up the correct statement from the following:
-
Question 41 of 78
41. Question
Pick up the correct statement from the following:
-
Question 42 of 78
42. Question
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
-
Question 43 of 78
43. Question
Pick up the correct statement in case of water supply.
-
Question 44 of 78
44. Question
The concrete work for the following part of the building of specified thickness is measured in square metres
-
Question 45 of 78
45. Question
The expected out turn of 12 mm plastering with cement mortar is
-
Question 46 of 78
46. Question
The measurement is made for stone work in square metre in case of
-
Question 47 of 78
47. Question
Carpet area does not include the area of
-
Question 48 of 78
48. Question
Pick up the correct statement from the following:
-
Question 49 of 78
49. Question
In case of laying gullies, siphons, intercepting traps, the cost includes
-
Question 50 of 78
50. Question
The inspection pit or chamber is a manhole provided in a base drainage system
-
Question 51 of 78
51. Question
Pick up the incorrect statement from the following:
-
Question 52 of 78
52. Question
The ‘centre line method’ is specially adopted for estimating
-
Question 53 of 78
53. Question
Pick up the incorrect statement from the following:
-
Question 54 of 78
54. Question
The unit of measurement is per quintal for the following:
-
Question 55 of 78
55. Question
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
-
Question 56 of 78
56. Question
The order of booking dimensions is
-
Question 57 of 78
57. Question
Pick up the incorrect statement regarding a master trap from the following:
-
Question 58 of 78
58. Question
The detention period in a septic tank is assumed
-
Question 59 of 78
59. Question
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
-
Question 60 of 78
60. Question
Pick up the item of work not included in the plinth area estimate
-
Question 61 of 78
61. Question
The minimum width of a septic tank is taken
-
Question 62 of 78
62. Question
Pick up the item whose weight is added to the weight of respective item, is
-
Question 63 of 78
63. Question
The expected out turn for earth work in excavation in ordinary soil per workman per day is
-
Question 64 of 78
64. Question
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
-
Question 65 of 78
65. Question
The brick work is measured in sq metre, in case of
-
Question 66 of 78
66. Question
The height of the sink of wash basin above floor level is kept
-
Question 67 of 78
67. Question
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
-
Question 68 of 78
68. Question
The item of steel work which is measured in sq.m, is
-
Question 69 of 78
69. Question
The damp proof course (D.P.C.) is measured in
-
Question 70 of 78
70. Question
The volume is measured correct to the nearest
-
Question 71 of 78
71. Question
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
-
Question 72 of 78
72. Question
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
-
Question 73 of 78
73. Question
Size, capacity and materials need be specified for
-
Question 74 of 78
74. Question
The expected out turn of half brick partition wall per mason per day is
-
Question 75 of 78
75. Question
The floor area includes the area of the balcony up to
-
Question 76 of 78
76. Question
The slope of the outlet of ‘P trap’ below the horizontal is kept
-
Question 77 of 78
77. Question
The weight of an item is measured correct to nearest
-
Question 78 of 78
78. Question
Berms are provided in canals if these are