Quiz-summary
0 of 25 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
Information
Welcome to your Docks and Harbour Engineering Mock test – 2
Take an exciting test in Docks and Harbour Engineering Mock test
You have only 20 mins to complete the test (25 Questions)
Wish you all the best!!!
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 25 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Docks and harbours MCQ 0%
-
Thank You!
Have a nice day!
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- Answered
- Review
-
Question 1 of 25
1. Question
1 pointsThe shore line survey includes :
-
Question 2 of 25
2. Question
1 pointsWhich one of the following statements is not relevant to hydrographic survey :
-
Question 3 of 25
3. Question
1 pointsThe important component of a sea port is
-
Question 4 of 25
4. Question
1 pointsCretans :
-
Question 5 of 25
5. Question
1 pointsThe fixed mooring does not require
-
Question 6 of 25
6. Question
1 pointsThe low water datum for a lake is defined as the surface of the lake when it is at elevation
-
Question 7 of 25
7. Question
1 pointsA harbour is a place where
-
Question 8 of 25
8. Question
1 pointsPick up the incorrect statement from the following: In a dry dock block made of hard wood,
-
Question 9 of 25
9. Question
1 pointsOn a hydrographic map, the following feature is shown :
-
Question 10 of 25
10. Question
1 pointsDue to the impact of water wave on a sea shore structure
-
Question 11 of 25
11. Question
1 pointsThe dock wall is designed as a gravity retaining wall and is tested for
-
Question 12 of 25
12. Question
1 pointsThe shape of docks and basins is generally kept
-
Question 13 of 25
13. Question
1 pointsSurf zone is :
-
Question 14 of 25
14. Question
1 pointsWhich one of the following lines is used for tying a ship with a dock
-
Question 15 of 25
15. Question
1 pointsSoundings are required for
-
Question 16 of 25
16. Question
1 pointsIf h and h1 are the heights of a light house and the observer in a ship in metres above M S L then the horizontal distance from the ship to the light house in kilometres is
-
Question 17 of 25
17. Question
1 pointsPick up the correct statement from the following:
-
Question 18 of 25
18. Question
1 pointsFor location of soundings a range and one angle from the shore involves the following operations. Which one is correct ?
-
Question 19 of 25
19. Question
1 pointsPick up the correct statement from the following:
-
Question 20 of 25
20. Question
1 pointsPick up the correct statement from the following:
-
Question 21 of 25
21. Question
1 pointsPick up the incorrect statement from the following:
-
Question 22 of 25
22. Question
1 pointsIn a wet dock system,
-
Question 23 of 25
23. Question
1 pointsA roadstead :
-
Question 24 of 25
24. Question
1 pointsThe width of the entrances of the harbours is restricted to
-
Question 25 of 25
25. Question
1 pointsPick up the correct statement from the following: