SSC JE Civil Engineering Preliminary Exam in January 2018 | Practice test Day – 42



Welcome to your SSC JE Civil Engineering 2018 Objective Exam Practice test Day - 42
Take an exciting test in SSC JE Civil Preliminary Exam in January 2018. 
You have only 20 mins to complete the test (25 Questions)
Wish you all the best!!!
Name
Email
1.

In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having

1 out of 25
2.

If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be

2 out of 25
3.

A critical ratio scheduling

3 out of 25
4.

Grader is used mainly for

4 out of 25
5.

Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?

5 out of 25
6.

Pick up the correct statement from the following

6 out of 25
7.

At a work site, statistical quality control of concrete means

7 out of 25
8.

The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as

8 out of 25
9.

For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5,  17 and 8 days respectively, The expected time is

9 out of 25
10.

Which of the following does not represent an activity?

10 out of 25
11.

Sensitivity analysis is a study of

11 out of 25
12.

Preliminary project report for a road project must contain

12 out of 25
13.

Free float is mainly used to

13 out of 25
14.

Which of the following earth moving machines has the shortest cycle time?

14 out of 25
15.

The time with which direct cost does not reduce with the increase in time is known as

15 out of 25
16.

A golden rule for the procurement of construction stones, suggests

16 out of 25
17.

During the construction period, price variation clause in contracts caters to

17 out of 25
18.

In time-cost optimization of a project, crashing is done.

18 out of 25
19.

In PERT analysis, the time estimates of activities and probability of their occurrence follow

19 out of 25
20.

For the network shown in the given figure, the expected time for the activity

20 out of 25
21.

Critical path method

21 out of 25
22.

For which of the following materials, the output of power shovels for a fixed shovel size will be maximum

22 out of 25
23.

In resources levelling

23 out of 25
24.

Pick up the correct statement from the following with regards to C.P.M. network analysis of projects

24 out of 25
25.

Updating may result in

25 out of 25






Be the first to comment on "SSC JE Civil Engineering Preliminary Exam in January 2018 | Practice test Day – 42"

Leave a Reply

[NPTEL Notes PDF] Civil Engineering (105 Courses in PDF Format)

Ships within 5 days | ₹ 1,250 Only.

This is the one time cost you spend for getting very good quality notes PDF for preparing any kind of Competitive exams. 

Subscribe and get the latest posts and study materials to your mail!

Enter your email address:

Delivered by FeedBurner

Those who are subscribed our web, kindly verify your mail received by you. Those who are verified, kindly ignore this message.

// hide the meta tag generator from head and rss function disable_meta_generator() { return ''; } add_filter('the_generator','disable_meta_generator'); remove_action('wp_head', 'wp_generator');