Hydrology & Water resource engineering Mock test – 3 || Civil Engineering Mock tests - CIVIL ENGINEERING OBJECTIVE

Hydrology & Water resource engineering Mock test – 3 || Civil Engineering Mock tests




Welcome to your Hydrology & Water resource engineering Mock test - 3
Take an exciting test in Hydrology & Water Resource engineering 
You have only 20 mins to complete the test (25 Questions)
Wish you all the best!!!
Name
Email
1. Horizontal acceleration due to earthquake results in
2. For wave action in dams, the maximum height of freeboard is generally taken to be equal to
3. In India the recording type rain gauge generally used, is
4. Seepage through embankments in an earthen dam is controlled by
5. Water contains
6. The main cause of meandering is
7. For the estimate of high floods in fan-shaped catchment, the formula used is
8. The quantity of water retained by the sub-soil against gravity, is known
9. Hydrograph is a graphical representation of
10. Tortuosity of a meandering river is always
11. The main function of a divide wall is to
12. The critical depth in a channel can be produced
13. According to Khosla theory  the exit gradient in the absence of a downstream cut-off is
14. Which of the following spillways is least suitable for an earthen dam?
15. Indian Meteorological department uses the standard gauges whose collectors have apertures of
16. Sharp crested weirs are generally used
17. If the loss due to friction in pipes is 4 m, the total losses in strainer and bends may be taken as
18. A runoff river plant is
19. The run off a drainage basin is
20. Which of the following can be used as a meter fall?
21. If the axial length of a drainage basin is 35 km and its form factor is 0.2, the total area of the basin is
22. Which of the following canal outlets maintains a constant discharge?
23. The major resisting force in a gravity dam is
24. In the derivation of Thiem's formula, Q = (S1 - S2)/[2.3 log10( / )] the following assumption is not applicable
25. The net speed under which the turbine reaches its peak efficiency is called