Building Construction Mock test – 1 || Civil Engineering Mock tests - CIVIL ENGINEERING OBJECTIVE

Building Construction Mock test – 1 || Civil Engineering Mock tests




Welcome to your Building Construction Mock test - 1
Take an exciting test in Building Construction
You have only 20 mins to complete the test (25 Questions)
Wish you all the best!!!
Name
Email
1) Depth or height of the arch is the
2) The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as
3) The bearing capacity of a water logged soil can be improved by
4) The type of roof which slopes in two directions with a break in the slope on each side is known as
5) The process of filling hollow spaces of walls before plastering, is known
6) The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
7) The wedge shaped bricks forming an arch ring, are called
8) A stair should not have pitch more than
9) A floor constructed with the 4 to 6 mm marble chips, is known
10) The form work from the slabs excluding props, can be removed only after
11) the masonry and bottom is kept flushed with face of wall, is
12) The minimum strength of the mortar used in load bearing brick masonry, is
13) The type of arch generally constructed over a wooden lintel or over a flat arch for the purpose of carrying the load of the wall above is
14) The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called
15) Pick up the correct statement from the following:
16) A wall constructed with stones to protect slopes of cuttings in natural ground from the action of weathering agents, is called
17) Cast iron piles
18) For different layers of cement concrete floor. Pick up the incorrect statement from the following:
19) The maximum total settlement for isolated foundations on clayey soils should be limited to
20) The inclined surface of an abutment to receive the arch, is known as
21) The number of steps in a flight generally should not be less than
22) Open test pit is only suitable upto a depth of
23) The platform at the end of a series of steps, is known as
24) For each storey of a building, the depth of exploration should be
25) As compared to stretcher course, the thickness of joints in header course should be