Construction Project and Management Mock test – 1 || Civil Engineering Mock tests




Welcome to your Construction Project and Managment Mock test - 1
Take an exciting test in Construction and Project Management Mock tests 
You have only 20 mins to complete the test (25 Questions)
Wish you all the best!!!
Name
Email
1. For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5,  17 and 8 days respectively, The expected time is
2. The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as
3. For which of the following materials, the output of power shovels for a fixed shovel size will be maximum
4. A golden rule for the procurement of construction stones, suggests
5. Which of the following does not represent an activity?
6. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
7. Free float is mainly used to
8. Sensitivity analysis is a study of
9. Which of the following earth moving machines has the shortest cycle time?
10. In resources levelling
11. If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be
12. Preliminary project report for a road project must contain
13. In time-cost optimization of a project, crashing is done.
14. In PERT analysis, the time estimates of activities and probability of their occurrence follow
15. Critical path method
16. Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
17. For the network shown in the given figure, the expected time for the activity

18. Updating may result in
19. Pick up the correct statement from the following
20. A critical ratio scheduling
21. At a work site, statistical quality control of concrete means
22. Grader is used mainly for
23. The time with which direct cost does not reduce with the increase in time is known as
24. In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having
25. During the construction period, price variation clause in contracts caters to