1. The width of a dowla is generally kept between 30 to 60 cm and its height above the road level should invariably be more than
2. In a concrete canal the approximate permissible velocity of water should not exceed
3. The water face of the guide banks, is protected by
4. The ratio of the rate of change of discharge of an outlet to the rate of change in level of water surface in a distributary at its normal depth, is known as
5. While deciding the alignment of a proposed canal taking off from a river at B, three alignments of approximately equal lengths are available. These cross a drainages at C1, C2 and C3 where drainage bed levels C1 > C2 > C3, you will provide at site C3
6. A counter berm is
7. If average particle size of the silt in millimetres is m, the Lacey's silt factor f is proportional to
8. A current meter measures the velocity of flow, if it is held
9. According to Lacey, depth of scour in a river depends upon the straightness of the reach. If D is the depth of scour in regime flow in a right angled bend, it is
10. Cross regulators in main canals are provided
11. The ratio of the rate of change of discharge of an outlet and parent channel, is known as
12. For standing crops in undulating sandy fields, the best method of irrigation, is
13. Lane's weighted creep theory assumes
14. The field capacity of a soil depends upon
15. A land is said to be water-logged if its soil pores within
16. If water table is comparatively high, the irrigation canal becomes useless, due to
17. Pick up the correct sequence of the part of a canal system from the following
18. The ratio of the head recovered to the head put in, is known as
19. The level of the fioor of a syphon aqueduct can be obtained
20. If the straight sides of a triangular section of a lined canal with circular bottom of radius D, make an angle θ with horizontal, the hydraulic mean depth is
21. The most suitable section of a lined canal, is
22. For cereal crops the most commonly adopted method of irrigation, is
23. For diversion of flood water of rivers, the type of canal constructed, is
24. The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is
25. Garnett's diagrams are used for graphical solution of design equations of a canal by
26. In rigid module, the discharge
27. In a syphon aqueduct
28. The uplift pressure on the roof of an inverted syphon, is maximum when
29. Effective precipitation for a crop may be defined as
30. To hold hydraulic jumps, baffle walls are provided in
31. An outlet is said to be proportional if its flexibility, 
32. Lacey's equation for calculating flood discharge in rivers, is